104 Wind turbines

Technical data
- Turbines Vestas V100/2MW and GE 82.5


Hereford wind farm
at a glance
Located in Deaf Smith County, TX. Commissioned in 2014, and power sold merchant in ERCOT. This project includes 50 Vestas V100/2MW and 54 GE 82.5 wind turbines of 1.85 MW.
- Boralex owns 50% of the site's interest. The total installed capacity of the site is 200 ME.