Skip to main content

Caumont-Chériennes Caumont, Chériennes

Operational project

Location

Caumont, Chériennes, Pas-de-Calais, France

Description

  • Commissioning dateJuly 2023
  • Installed capacity17 MW
  • Around 19,300* inhabitants Supplied with electricity

  • 5 Wind turbines

  • Around 1,800* tons of CO2 Avoided annually

Techniciens et techniciennes face à une éolienne

Technical data

  • TurbinesVestas V126
  • Rotor diameter126 m
  • Platform height87 m
  • Blade size63 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

About the Caumont-Chériennes Wind Farm

The Caumont-Chériennes wind farm is located in the municipalities of Caumont and Chériennes in the Pas-de-Calais department. Commissioned in 2023, it consists of 5 wind turbines with a total installed capacity of 17 MW.

This site generates the equivalent of the annual electricity consumption of 19,300* residents. Thanks to this installation, nearly 1,800* tonnes of CO₂ emissions are avoided each year. This project is fully aligned with Boralex’s strategy to accelerate the energy transition across the region.

Child sitting and looking at a wind turbine in Canada