Skip to main content

Longhorn wind farm Briscoe and Floyd Counties

Operational project

Location

Briscoe and Floyd Counties, Texas, United States

Description

  • Commissioning dateMay 2015
  • Installed capacity200 MW
  • 100 Wind turbines

Technicienne souriante sur le toit d'une éolienne levant les mains au ciel

Technical data

  • TurbinesVestas V100

About Boralex

All you need to know about Boralex's activity worldwide.

This way

Technicien souriant
Limekiln Wind Farm turbine close-up, Scotland

Longhorn wind farm 
at a glance

Located in Floyd and Briscoe Counties, TX. Commissioned in 2015 and has a PPA with Exelon expiring in April 2026. This project includes 100 Vestas V100/2MW wind turbines. Boralex owns 50% of this site's interest. The total installed capacity of the site is 200 MW.

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex