-
100 Wind turbines

Technical data
- TurbinesVestas V100


Longhorn wind farm
at a glance
Located in Floyd and Briscoe Counties, TX. Commissioned in 2015 and has a PPA with Exelon expiring in April 2026. This project includes 100 Vestas V100/2MW wind turbines. Boralex owns 50% of this site's interest. The total installed capacity of the site is 200 MW.
