Skip to main content

Frampton Frampton

Operational project

Location

Frampton, Quebec, Canada

Description

  • Commissioning dateJanuary 2015
  • Contract duration20 years
  • 24 MW Production

  • 12 Wind turbines

Techniciens et techniciennes face à une éolienne

Technical data

  • Turbines12 Enercon E-82
  • Rotor speed19.5 rpm
  • Rotor diameter92 m
  • Platform height83 m

About Boralex

All you need to know about Boralex's activity worldwide.

This way

Technicien souriant
Technicienne souriante sur le toit d'une éolienne levant les mains au ciel

Site overview

The municipality of Frampton owns 33.3% of Frampton Community wind farm and 66.7% by Boralex. The project is located on private land in the municipality of Frampton, in Chaudière-Appalaches, Quebec. The project consist of 12 Enercon E-82 turbines and is covered by a power sales contract with Hydro-Québec. With a 20-year term, the contract was awarded under the Hydro-Québec Distribution request for proposals for 250 MW of wind power in 2009. 

The project partners

  • Municipality of Frampton : 33.3 % of parts
  • Boralex : 66.7 % of parts